Theia

Article

Bintulu Port Holdings Berhad to Complete Port Operating System Installation by April 2026

INDUSTRIAL IOT

Bintulu Port Holdings Berhad (BPHB) is set to complete the installation of its Port Operating System (POS) at Bintulu Port by April 2026. This initiative is part of a broader digital transformation strategy aimed at achieving full digitalisation by 2030. The POS has already been implemented at Samalaju Industrial Port since September 2025.

Bintulu Port Holdings Berhad to Complete Port Operating System Installation by April 2026
Feb 12, 2026, 11:34 PM

No comments yet. Be the first to share your thoughts!