HMWSSB Advances Godavari Water Supply Project Phases 2 & 3 for Hyderabad
FLOW CONTROL
The Hyderabad Metropolitan Water Supply and Sewerage Board (HMWSSB) is accelerating the construction of the raw water pump house at Mallanna Sagar as part of the Godavari Drinking Water Supply Scheme Phases 2 & 3, with an estimated cost of ₹7,360 crore. The project aims to supply an additional 20 TMC of Godavari water to Hyderabad, enhancing urban water supply and supporting the Musi river rejuvenation. Construction includes a 3,000 mm diameter pipeline and a 1,170 MLD Water Treatment Plant, targeting completion within two years.

Feb 7, 2026, 7:13 PM