Benghazi Water Supply Temporarily Reduced for Pipeline Work
WATER INFRASTRUCTURE & DESALINATION
The Water and Wastewater Company in Benghazi announced a temporary water supply reduction today from 9 AM to 2 PM for technical work on a 400mm pipeline on Sudan Street. The estimated reduction volume is 60,000 cubic meters, with the city's allocated share at approximately 210,000 cubic meters.
This measure aims to improve water network efficiency and accommodate increasing demand. The company assures that the reduction will be temporary, with specialized teams monitoring the project to resume normal water supply immediately after completion.

Feb 28, 2026, 6:03 AM