Closure of Brandt Factory and Other Setbacks in Loir-et-Cher, 2025
HYDROGEN
In 2025, Loir-et-Cher faced significant challenges, including the closure of the Brandt factory in Vendôme, affecting 91 employees, and extensive damage from a June storm that left 9,000 without power. Other setbacks included the abandonment of the Elogen hydrogen project, the destruction of the ValÉco waste center by fire, and a rise in road fatalities, with 30 deaths reported by year-end. Additionally, the Châteauvieux nursing home closed, impacting 12 residents and 43 staff, while cereal prices fell despite better yields.

Dec 29, 2025, 8:58 PM