Fulcrum Metals Achieves Major Advances in Tailings Extraction Technology at Teck Hughes Project, Ontario
STRATEGIC MINERALS
Fulcrum Metals reports significant improvements in gold recovery rates at its Teck Hughes tailings project in Ontario, achieving up to 78% recovery, a 31% increase from earlier tests. The trials, conducted with Extrakt Process Solutions, also recover multiple co-products without cyanide.
The estimated in-situ metal value is around $750 million, with a recoverable value of over $550 million suggested. Fulcrum aims to establish a processing hub by connecting this project with its Sylvanite site and is focused on scaling up operations.

Feb 11, 2026, 6:11 AM