Jumbo Offshore Secures Contracts for Transition Piece Installation at Offshore Wind Farm
WIND ENERGY
Jumbo Offshore has signed two contracts for the transport and installation of Transition Pieces (TPs) for an offshore wind farm development. The TPs will be installed using one of Jumbo's two DP2 heavy-lift vessels. The contracts also include full management and operation of the marshalling yard, which encompasses receiving the TPs from the transport vessel, transferring them to storage, preparing them for installation, and returning them to the quay for loading onto the installation vessel.

Dec 13, 2025, 12:16 PM