Tritton Copper Operations Enhances Efficiency with Metso MDM250 Mill Discharge Pump Upgrade
STRATEGIC MINERALSFLOW CONTROL
Tritton Copper Operations has upgraded to the Metso MDM250 mill discharge pump, doubling wear life from 1,200 to 2,184 hours, reducing annual rebuilds from seven to four, and improving hydraulic efficiency by 20%. The installation, completed in 2023, aims to increase processing capacity from 1.4 million to 1.8 million tonnes per annum while decreasing seal water usage by approximately 74%. The pump's design minimizes slurry recirculation, enhancing reliability and reducing total cost of ownership.

Feb 19, 2026, 6:00 AM