UJVN Invites Bids for 30 MW/75 MWh BESS at Dhakrani Hydel Project in Uttarakhand
ENERGY STORAGE
UJVN has invited bids for a 30 MW/75 MWh battery energy storage system at the Dhakrani Hydro Electric Project in Uttarakhand. Bids are due by February 25, 2026, with openings on February 28. The project will be developed under a build-own-operate-and-transfer model and is part of a 60 MW/150 MWh storage capacity program supported by ₹1.8 million (~$19,700)/MWh funding. Estimated project cost is ₹1.71 billion (~$18.7 million).

Feb 6, 2026, 6:04 AM