Theia

Article

Florina Secures ESFA Funding for Natural Gas Infrastructure and Heating System Upgrades

NATURAL GAS

The ESFA has approved funding for natural gas infrastructure and heating system upgrades in Florina for the period 2021-2027. The second phase includes a new distribution network with 16,251.55 meters of low-pressure pipeline and 2,214.90 meters of medium-pressure pipeline, costing €6,314,990.50. Additionally, €17,033,012.50 is allocated for replacing heating systems with natural gas systems.

Florina Secures ESFA Funding for Natural Gas Infrastructure and Heating System Upgrades
Feb 25, 2026, 7:54 PM

No comments yet. Be the first to share your thoughts!