Geothermal Drilling Preparations for Radoszyce GT-1 Well in Poland
GEOTHERMAL
Preparatory work for the Radoszyce GT-1 geothermal well has begun in Radoszyce, Poland. The well will reach a depth of 1360 meters, targeting the Lower Triassic aquifer with expected temperatures of 40-45°C. The total project cost is approximately 12 million PLN, funded partly by the 'Polish Geothermal Water Acquisition' program.

Feb 19, 2026, 6:12 AM