ABB Delivers Power System for UK's First AI Data Center in Surrey
ABB has completed the delivery of the first turnkey uninterruptible power supply (UPS) system at an AI-focused data center in Surrey, UK. The system, with a capacity of 25 MVA, is designed for high-density computing, meeting the increased power demands of artificial intelligence applications.
This initiative supports Ark Data Centres' expansion plans, including the installation of next-generation GPU systems for large-scale AI training and inference. The ABB UPS system, HiPerGuard, integrates with UniGear switchgear and Zenon ZEE600 control systems, achieving a 98% efficiency rate at high load. The project, a collaboration between Ark, ABB, and installation firm JCA, addresses the growing electricity needs of AI infrastructure, emphasizing the importance of reliable power supply for operational efficiency and environmental considerations.
