NorthC Group Begins Construction of New Data Center in Geneva, Switzerland
DATA AND AI INFRASTRUCTURE
NorthC Group has announced the commencement of construction on a new data center in Geneva, Switzerland, set to begin in Q1 2026 and expected to be completed by Q2 2028. The facility will feature a total IT capacity of 4.5 MW, utilize 100% green energy, and incorporate a liquid cooling system tailored for AI applications. Additionally, it will support modular design for capacity expansion and connect with other NorthC locations in Switzerland, with plans for waste heat exchange with nearby buildings.

Jan 14, 2026, 6:38 PM