Novra Power to Develop Gas Turbine Fleet for AI Data Centers Using Additive Manufacturing
DATA AND AI INFRASTRUCTURE
Novra Power is set to develop a fleet of gas turbine rental assets to alleviate power supply issues for AI data centers, utilizing additive manufacturing to streamline the supply chain. These transportable turbines will provide interim power solutions until grid connections are established, with major components produced via 3D-printing technology for quicker deployment. Founded in 2025, Novra Power aims to partner for a demonstration site by the end of 2026.

Jan 24, 2026, 6:14 AM